4.3 Legged Tubular Steel Tower

3 Legged Tubular Steel Tower
September 25, 2024
Category Connection: 3 Legged Tubular Steel Tower
Brief: From concept to demonstration, this video highlights the evolution and practical outcomes of the 4.3 Legged Tubular Steel Tower. You will see a detailed walkthrough of its robust lattice structure, assembly process, and how it withstands extreme wind conditions. Watch as we showcase the tower's construction, from galvanizing to final testing, providing real insights for B2B professionals in the telecom infrastructure sector.
Related Product Features:
  • Designed to meet TIA/EIA-222-G/F standards for structural integrity and safety.
  • Constructed from high-strength mild or high tensile steel with hot-dip galvanized or painted surface treatment.
  • Engineered to withstand design wind speeds of up to 250 km/h for reliable performance.
  • Features a triangular lattice structure with tubular steel legs for enhanced stability and wind resistance.
  • Includes platforms and ladders for safe access and maintenance during operation.
  • Factory tested with tensile, impact, and bending tests to ensure quality and durability.
  • Available in heights ranging from 10 to 40 meters to suit various telecom needs.
  • Bolts and nuts conform to ISO and DIN standards for secure and durable connections.
FAQs:
  • What is the structural design of the 3-legged tubular steel tower?
    The tower features a triangular lattice structure made from tubular steel, connected by flanges and designed for high wind resistance and stability, complying with TIA/EIA-222-G/F standards.
  • How is the tower protected against corrosion?
    The steel sections, bolts, and nuts are hot-dip galvanized according to ISO 1461 or ASTM A123/A153 standards, ensuring long-term durability in harsh environments.
  • What are the delivery and packaging details for this tower?
    The tower is bundled with galvanized strapping as per client requirements, with bolts packed in robust nylon bags or steel drums, and shipped within 20 days after payment from Tianjin port.
Related Videos

14.3 Legged Tubular Steel Tower

3 Legged Tubular Steel Tower
September 25, 2024

13.3 Legged Tubular Steel Tower

3 Legged Tubular Steel Tower
September 25, 2024

12.3 Legged Tubular Steel Tower

3 Legged Tubular Steel Tower
September 25, 2024

4-leggeed-steel-angular

4 Legged Angular Steel Tower
January 08, 2026

4-leggeed-angular

4 Legged Angular Steel Tower
January 08, 2026

Telescopic tower

Other Videos
January 09, 2026

Telescopic tower

Other Videos
January 09, 2026

Power Transmission Tower

Power Transmission Tower
October 28, 2024

3 Legged Angular Steel Tower

3 Legged Angular Steel Tower
July 05, 2024

2.3 legged steel communication tower

3 Legged Angular Steel Tower
September 25, 2024