Cellular signals and antennas

All
October 11, 2024
Category Connection: 4 Legged Angular Steel Tower
Brief: Discover the Hot Dip Galvanized 3/4 Leg Lattice Telecom Tower, a robust and durable solution for telecommunication needs. Designed to withstand high wind speeds up to 250 km/h, this tower ensures reliable signal transmission with its high-quality materials and advanced engineering.
Related Product Features:
  • Designed to meet TIA/EIA-222-G/F standards for structural integrity.
  • Constructed from high-grade Mild Steel or High Tensile Steel for durability.
  • Withstands wind speeds up to 250 km/h for reliable performance in harsh conditions.
  • Features hot dip galvanization for corrosion resistance (ISO 1461 or ASTM A123).
  • Includes CO2 Shielded Arc Welding & Submerged Arc Welding for strong joints.
  • Factory tested for tensile strength, impact resistance, and more.
  • Available in customizable heights and configurations to suit various needs.
  • Quick delivery within 20 days after payment from Tianjin port.
Faqs:
  • What materials are used in the construction of the telecom tower?
    The tower is constructed from high-grade Mild Steel (Q235B, Q235C, Q235D) or High Tensile Steel (Q345B, Q345C, Q345D), ensuring durability and strength.
  • How is the tower protected against corrosion?
    The tower is hot dip galvanized according to ISO 1461 or ASTM A123 standards, providing excellent corrosion resistance for long-term use.
  • What is the delivery time for the telecom tower?
    The tower is shipped within 20 days after payment from Tianjin port, ensuring timely delivery for your project needs.
Related Videos

Factory

All
October 11, 2024

Factory

All
October 11, 2024

3 Legged Tubular Steel Tower

3 Legged Tubular Steel Tower
July 05, 2024

4 Legged Angular Steel Tower

4 Legged Angular Steel Tower
July 05, 2024

2.Monopole Tower

Monopole Tower
September 25, 2024

2.3 legged steel communication tower

3 Legged Angular Steel Tower
September 25, 2024

Guard Tower

Guard Tower
October 11, 2024

Guard Tower

Guard Tower
October 11, 2024

3.Guyed WireTower

Guyed Wire Tower
September 25, 2024

1.3 Legged Tubular Steel Tower

3 Legged Tubular Steel Tower
September 25, 2024